Upload your plan check correction letter and your plan set. We revise the sheets, cloud every change and write the comment-by-comment response letter your plan checker needs — so you can resubmit and get building.
| County comment | Action | Sheet | |
|---|---|---|---|
| Smoke/CO alarm locations not shown | Add to electrical plan | E-1 | We fix it |
| Stair headroom and riser/tread not dimensioned | Add stair section + dimensions | A-4 | We fix it |
| Bedroom 3 egress window size unclear | Update window schedule, note clear opening | A-1 | We fix it |
| Provide calculations for 18′ beam at great room | Structural engineer required | S-1 | Engineer |
| Owner signature missing on application | You sign and upload | — | Your input |
These are the most common residential plan check comments. Most are fixed on the drawings in hours — if you know exactly what the reviewer wants.
Your correction letter and current plan set (PDF is fine).
See instantly how many comments we fix and which need an engineer.
$499 flat. Add 48-hour Rush if your deadline is close.
Every change clouded, delta-tagged and dated on the sheets.
Every comment answered with where the fix is.
Send it in. Same comments back? We revise again free.
Every change marked with a revision cloud and delta tag, with a new revision date in the title block — exactly how plan checkers expect to see it.
Each reviewer comment restated with our response and the sheet and detail where it was resolved.
Comments that need structural, civil, energy or other licensed services are listed separately in plain English, so you know exactly what to ask for.
If the same comments come back from the plan checker, we revise again at no charge.
No counting comments, no hourly billing. A week lost in corrections usually costs more than this in builder delays and loan interest.
Comments requiring licensed structural, civil, energy or other engineering services will be identified separately. We don't alter sheets stamped by another professional, and we can't guarantee approval — your building department has the final word.
Revised plan sheets with every change marked by a revision cloud and delta tag and a new revision date, a comment-by-comment response letter you submit with the resubmittal, and a separate list of any comments that need a licensed engineer or other specialist.
Yes — $499 covers every drafting comment in one correction letter, whether there are 3 or 30. Engineering, stamps and permit fees are not included. If your letter actually requires a redesign rather than corrections, we tell you within 1 business day, before any work starts, and refund you in full if you don’t want to proceed.
3–5 business days as standard. Add Rush (+$199) and we deliver within 48 hours of your order.
If the same comments come back, we revise again free. New comments on a new round are a new order.
No. Comments requiring licensed structural, civil, energy or other engineering services are identified separately, with a plain-English description of what to ask the engineer for. We coordinate our drawings with their calcs once you have them.
Yes — provided you own the plans or have permission / the right to modify them. We never alter sheets that carry another professional’s stamp; stamped sheets go back to that professional. Some jurisdictions require revisions by the designer of record or a licensed professional — check your local rules.
No. We work from PDFs. If you have DWG files, send them — it can make the revisions cleaner.
Yes. Upload your correction letter and you instantly see how many comments it contains, how many we can fix and which need an engineer. You only pay if you want us to do the revisions.
Not in corrections yet? Check what your permit will cost with the permit calculator, or have your plan reviewed before you submit with a professional plan review.
Free instant analysis. $499 flat. Revised sheets in 3–5 business days.
Upload My Correction Letter